EXCALIBUR involves its remediation engineers at the earliest project planning and investigation stages to identify presumptive remedies and key feasibility and remedial design data needed later in the project. Clients find this early involvement of the design staff helps to steer the investigative efforts toward the ultimate goal—cost effective site closure. EXCALIBUR staff constantly concentrate on design quality and value engineering using the most advanced remediation technologies and ideas available while balancing the risks of employing emerging technologies against possible rewards. Cost effective field screening and limited field sampling plans are another one of the hallmarks of EXCALIBUR’s services. Simply put, we develop approaches that maximize the quality and minimize the quantity of the information we need to collect to get the job done correctly. Combined with our ability to conduct site-specific risk assessments, modeling, and remedial alternatives analyses, we help clients quickly identify the most cost-effective options to resolve environmental issues.
EXCALIBUR’s engineering staff has frequently been recognized by clients and the regulatory community alike for implementing highly effective approaches to solve challenging environmental problems. One such example involves a very large integrated system designed to simultaneously address solvent-laden groundwater and saturated soils immediately beneath a major Fortune 500 manufacturing plant that operated 24 hours a day. The system extracted and treated the contaminated groundwater beneath the factory while simultaneously exposing the soils for effective vapor extraction and treatment. Avoiding any operational disruptions and differential settling while delivering dependable remedial performance were the client’s primary goals. Based on the success in meeting all these objectives, the senior corporate engineer responsible for meeting the stringent regulatory and operational requirements hailed the engineering the best job he had ever seen, while the Corporate Director for Remediation Services for this same major Fortune 500 chemical company complimented Excalibur for providing excellent environmental services, responsiveness, client advocacy technical expertise, and cost effectiveness for over a decade.
EXCALIBUR’s core engineering, remediation and site closure client service areas are:
- Targeted bench/field pilot studies
- Conventional and emerging technology screening
- Reliable cost estimating
- Meaningful remedial alternative analyses
- Streamlined engineering design
- Detailed specifications development
- Comprehensive bid package preparation
- Managing competitive bidding, bid evaluation and contracting
- Equipment/materials procurement
- Environmental permitting
- Troubleshooting non-performing and under-performing or failed systems
- Independent third party engineering reviews of planned/ on-going engineering strategies
- Site preparation
- Construction management
- System installations
- Waste management
- Start-up and troubleshooting
- O&M and monitoring
- Regulatory reporting
- Complete site closures/restorations
- Independent third party engineering reviews of planned/on-going remediation strategies
- Remedial cost comparisons
- Reliable cost forecasting